Project cargo

 
Efficiency in handling and storage of project cargo
 
Since 1978, we have been the main port operator for oversized cargo and project cargo in the Port of Constanța. We have a storage capacity of 16,000 sqm on a concrete platform with a capacity of 15 tons/ sqm and equipment with a lifting capacity of units of up to 180 tons. Annually, we operate up to 100,000 tons of oversized goods.
 
 

For handling of project cargo we use 3 operating berths with a total length of 615 meters and a water depth of up to 13.5 meters.

berth 38

 
Length
205 meters
 
Water depth
12,5 meters
 

berth 39

 
Length
205 meters
 
Water depth
13,5 meters
 

berth 40

 
Length
205 meters
 
Water depth
13,5 meters
 

Complete services for handling and storage of metallurgical products

Ship / terminal operations

Ship / barge operations in RORO system

Storage on open platform

Sorting packages

Optimal solutions for handling and storage of oversized cargo/ project cargo

 
Currently, regardless of the particularities and challenges related to the storage and handling of oversized cargo, our team has the experience and determination to find the most suitable solutions.
 
 
In recent years, we have been involved in various special projects, operating: wind mill components, tanks/ boilers, bridges, cranes and factory components, transformers, drilling equipment, wagons, locomotives, buses, boats.

The storage platform on berth 39 (mainly used for the operation of ships with equipment) has an area of 16,000 square meters and it is used for the storage of different lots of cargo, in accordance with the planning taking into account the size of the lot, the specifics of the operation and the storage period.

The mobility of the equipment used for this cargo(Liebherr UMEX cranes, reach stacker loaders) allows the optimal use of the entire platform for storing goods.
If required, oversized cargo can be transported on trucks and stored onto the platform of berth 44 and in other UMEX locations.